Decision Maker: Director of Regeneration and Environment
Decision status: Recommendations Approved
Is Key decision?: No
Is subject to call in?: No
3.1 The Council entered into an agreement with
JMC (Engineering) UK Ltd in 2015. If it continues with this
arrangement, it will ensure the continuity of site security,
coupled with the extensive site-specific knowledge of the existing
contractor. This will ensure that there is no period where the site
is insecure. As a result, the health and safety risk will be
mitigated as far as reasonably possible.
3.2 The buildings and headstocks pose an immediate health and
safety risk; they are dilapidated and are attractive to trespassers
who have been known to climb similar headstocks, therefore creating
a significant health and safety risk.
3.2 As of 2 November 2018, the site report reflected that
theft/intruder activity has been increasing over this month.
Security personnel are still escorting thieves off site. Quads and
motocross bikes are running both around site and on the tips. As
reported, the main concern is surrounding incidents associated with
human factors - accidental or deliberate interventions by
trespassers, opportunist thieves, adrenaline junkies or closure
tourists.
3.3 The risk to human health will increase should any barriers or
security removed. As the likelihood of an incident will increase.
From a public health perspective, the site should be made as safe
as possible before the barriers or security is removed to protect
human health.
3.4 It should be noted that the site itself poses a number of major
risk (in accordance with those associated with large mining sites).
This includes issues such as lagoons, spoil tips and associated
subsidence.
3.5 There is no allocated budget for Hatfield Colliery so in order
for the work to be undertaken funding will need to be secured from
the Councils 2018/19 Contingency.
To continue to contract with JMC Engineering
to provide site security at Hatfield Colliery site for 2019/20. The
associated costs of this on-going security to be met from 2018/19
Contingency.
Option 1 - Do Nothing – if the Council
does nothing the site will be left without sufficient measures in
place to prevent unauthorised access to the remaining buildings and
Headstocks, representing a risk to health and safety. Given that
the Council has provided security on the site, it must be in
position to show that it has done all that is reasonable to prevent
accidents on the site before removing security.
Option 2 - Continue with current arrangements – this will
involve an ongoing commitment of approx. £150,000 per annum
for site security and site inspection and will not address the
deterioration of the headstocks and the buildings. (This has been
covered by a previous ODR ref RE17 0169).
Recommend option - to carry on with the current arrangement for
site security.
Publication date: 09/04/2019
Date of decision: 05/04/2019