See attached ODR for full details
Decision Maker: Assistant Director Partnerships, Early Intervention and Localities
Decision published: 25/08/2021
Effective from: 08/06/2021
Decision:
To increase the level of resource supporting
the re- engagement of children and young people who are missing
education or whose parents have opted to electively home educate
them.
Further details on the posts can be found within the attached
ODR.
Funding for these posts would come from the Opportunity Area
Programme.
The Doncaster Opportunity Area Funding is time limited and has to
be spent by the 31st August 2021.
Lead officer: Graham Batty
Reasons for the decision are:
- The council are part of a regional collaborative group across 24
authorities that jointly procure a eTendering system for the
benefits associated specifically ease of access for suppliers to
contract opportunities across the region and the economies of scale
associated with jointly procuring and contract managing a
system.
- The current contract with Proactis for the ETendering solution
(contract reference: C4713) ends on the 31st December 2021 and
there are no available extensions.
- The incumbent provider did not submit a bid for the new contract
so a new system will need to be implemented.
- An eTendering solution is a requirement of all public bodies
captured by the Public Contracts Regulations 2015, where
information relating to tendering activity must be available
electronically as per regulation 22.
- In addition to the regulatory requirement in having tender
documents electronically available. An eTendering solution
- North Yorkshire County Council have led the procurement on behalf
of the 24 Y&H authorities and this has involved all
stakeholders, including Doncaster Council, feeding into the
specification and other elements of the procurement. The
council’s ICT were consulted with on the specification and no
technical issues were raised.
- Eight tenders were received and evaluated in line with the
evaluation strategy. Four suppliers failed the minimum threshold
questions and were disqualified. The tender was evaluated on 60%
quality and 40% price.
- The highest scoring bidder is EU Supply (Mercell). This supplier
are experienced in working on multi-authority contracts for example
they currently deliver the national collaborative portal in Ireland
(6,400 buying organisations) and the Blue Light portal (40 buying
organisations).
- Leeds City Council will enter into the contract with Mercell UK
and Doncaster Council will pay Leeds City Council for their portion
through an agreement Memorandum of Understanding (MOU).
Decision Maker: Assistant Director Legal and Democratic Services
Decision published: 12/08/2021
Effective from: 10/06/2021
Decision:
To award a replacement contract for the
eTendering System used by the Council to EU Supply (Mercell UK) for
3+2+2 years from the 1st January 2022, following the conclusion of
a Public Procurement compliant open procurement process conducted
on behalf of the member authorities, by North Yorkshire Council.
The full cost to Doncaster Council if all extensions are exercised
is £92,022 (£13,146 per annum).
Lead officer: Scott Fawcus
Decision Maker: Audit Committee
Made at meeting: 29/04/2021 - Audit Committee
Decision published: 17/06/2021
Effective from: 29/04/2021
Decision:
Gareth Mills, Engagement Lead (Grant Thornton) presented a report which detailed progress in delivering their responsibilities as the Council’s External Auditor for the year ending 31st March 2021 and also provided a sector update.
Members’ attention was drawn to two key aspects within the report, one in relation to the proposed audit fee for 2020/21 and secondly, the proposed timetable for the 2020-2021 audit.
It was proposed that there would be an increase in audit fees for 2020-21 to £212,430. It was noted that both the Redmond Review and the Minister for Housing Communities and Local Government (MHCLG) had recognised the need to increase audit fees and as a consequence, MHCLG had made available £15m to local authorities to support the expected uplift in fees. The External Auditor in recognising that the fee was a significant uplift, pointed out that the increase in fees was consistent with discussions held with other local authorities. It was further reported that it was expected that the funding from MHCLG would offset the uplift in fees therefore, the net uplift for the Council resources would be nil. It was further explained that the detail of how the funding would be provided to each authority was unclear, but it was anticipated that funding would be paid to local authorities on a proportionate basis, with External Auditors billing the fee variation to the Local Authority who would then pay this in line with existing arrangements.
In relation to the proposed timeline for the completion of this year’s audit, the External Auditor advised that MHCLG has set an indicative date of 30th September 2021, however, given the challenging nature of the availability of specialist public sector external audit staff, the volume of local authority audits, the impact of the Covid-19 pandemic, remote working and the need to prioritise NHS clients earlier than the audit deadline of June 2021, it was anticipated that the target for completion of the Council’s accounts would be the end of October with a sign off of the accounts in November. The External Auditor explained that this would mean that the Council would not meet the indicative deadline for completion of the accounts. He pointed out that this was not a reflection of the work of the Financial Management Team, or the Council, but was because Grant Thornton was unable to deliver the audit by the end of September. He emphasised that there would be no financial penalty to the Council. He further explained that in accordance with the audit regulations the Council would need to post a brief statement on the Council’s website to the effect that as at 30 September the audit was still ongoing.
In relation to the consultation regarding allocation of the £15m funding, the Assistant Director of Finance advised that an update on the outcome of the consultation would be provided to the Committee at a future meeting. The Assistant Director of Finance highlighted that the Financial Management team would endeavour to continue as in previous years to meet the indicative deadline, but pointed out that this year’s accounts placed greater emphasis on the use of estimates which brings additional risks.
RESOLVED that the External Auditor’s progress report and sector update(Year Ending 31st March 2021), be noted.
DMBC spend approximately £50,000 per
annum on cash collection and delivery services. The service current
provider is Security Plus + Ltd, who have been providing the
services since 1st July 2013. The
current contract is due to expire on 30th June 2021.
Lot 8 of the ESPO Framework Agreement 324F-20 Cash Collection and
Cash in Transit Services has been identified as the best route to
market. This allows for Direct Award to one of three suppliers who
are on the Framework. These are Security Plus + Ltd and G4S Cash
Solutions (UK) Ltd and King Armoured Security.
Decision Maker: Assistant Director of Finance & Chief Financial Officer
Decision published: 14/06/2021
Effective from: 02/06/2021
Decision:
To award a contract for ‘Cash Collection
and Cash in Transit from Premises or Buildings of various types and
On street and Off street car parks (including pay and display
machines)’ from 1st July 2021 to Security Plus Ltd , who are
the existing supplier.
This will be done under Lot 8 of the ESPO Framework Agreement 324F
Cash Collection and Cash in Transit Services and will be a direct
award to Security Plus + Ltd.
The initial period will be for 2 years with an option to extend for
1 further period of 2 years. The total value of the contract will
be approximately £200,000.
Lead officer: Andrea Hedges
Ownership of the network was transferred to
Doncaster Council Officers shortly after its creation. Since then,
the Doncaster Green Space Network (DGSN) has been organised and
coordinated by various DMBC Officers, but there is no dedicated
Officer support.
Currently, there is no dedicated Officer support for the DGSN.
Through consultation both Doncaster Council and the community
groups involved in the network have recognised the need for
committed support to the DGSN. Additional support would provide the
resources, skills, and
attention to facilitate the development of the DGSN. This would
increase the capacity and effectiveness of the network, whilst also
providing Officers with additional capacity as the network grows in
efficiency and sustainability.
Working with an external organisation aligns with our values of
collaboration and partnership-building. Stepping away from the
current Council-centric approach, we will work collaboratively to
embed strength and sustainability within the Green Space Network
and Green Space Volunteering.
The strategic aims of the DGSN are to build community capacity and
sustainability within its community groups to support the
development of, and improve community engagement in,
Doncaster’s parks and green spaces. This will also support
wider priorities within the Public Health agenda by increasing
physical activity and improving health and wellbeing.
This is an opportunity to improve our ways of working with the
DGSN. It is important to ensure that Get Doncaster Moving’s
key strategic values are incorporated in the decision-making
process.
We also wish to involve members of the GSN within the subsequent
recruitment or tendering process. We will continue to seek the
views of members of the GSN in the future and incorporate these
perspectives into future development of the network and its
governance.
Decision Maker: Director of Public Health
Decision published: 14/06/2021
Effective from: 04/05/2021
Decision:
Appoint to the post of the Doncaster Green
Space Network Co-ordinator through by an external organisation via
a procurement exercise.
A suitable partner will be sourced to support and facilitate the
running of the Doncaster Green Space Network over the course of the
Future Parks Programme. The purpose of the network is to provide a
space for community groups to collaborate, share learning, and
develop their volunteering capacity.
The funding for this role is in place through Get Doncaster Moving
- Doncaster Future Parks.
GDM has £165,150 funded from Sport England over 5 years, to
provide a Coordinator.
Lead officer: Ben Russell
Local Authorities were directed to join a
Regional Adoption Agency through the Education and Adoption Act
2016 by 2020.
The key principle behind the regionalisation of adoption services
is that, on a national level, children are waiting far too long to
be matched and placed with their adoptive families. By pooling
resources, adoption agencies are more likely to increase the choice
of prospective adopters and therefore identify matches more quickly
and thus reduce the time that these children remained looked after
in the care of the local authority.
As a result, the driving force for the initiative was very much to
improve the outcomes for looked after children with a permanence
plan of adoption. It has taken 2 years to reach a position where
the four local authorities are supportive of the business case (as
approved by the Key Decision Report) and are fully committed to the
setup of the SYRAA, satisfied that the specification will meet the
following 3 criteria:
- No reduced performance
- No increased costs
- No negative impact on the Terms and Conditions of staff.
The financial implications were covered in depth within the July
2020 Key Decision report and outline that the cost of the SYRAA
will be funded by the pooled budgets of the four local authorities,
and any underspend or overspend allocated equally.
The impact on staff will be minimal as none of the adoption teams
will move from their current location and they will remain
employees of each of the local authorities.
Formal governance of the SYRAA will be provided through the South
Yorkshire Regional Adoption Agency Governance Board that will be
responsible for providing oversight and challenge to the regional
arrangements.
It is understood that Cabinet approvals from all Local Authorities
are in place.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 14/06/2021
Effective from: 01/03/2021
Decision:
to approve the completion of the South
Yorkshire Regional Adoption Agency (“SYRAA”) Agreement
enabling the implementation of a Regional Adoption Service hosted
by the Doncaster Children’s Services Trust for Doncaster,
Barnsley, Sheffield and Rotherham local authorities. The Service to
be known as One Adoption South Yorkshire or
“OASY”.
This decision is in accordance with a Key Decision on the 21st July
2020 for the Cabinet Member for Young People, Children and Schools
to:
a) Agree that Doncaster adoption services should join the South
Yorkshire Regional Adoption Agency (SYRAA) with Barnsley, Sheffield
and Rotherham Local Authorities;
b) Agree that Doncaster Children’s Services Trust can act as
lead organisation and host of the South Yorkshire Regional Adoption
Agency;
c) Mandate to proceed to the detailed implementation phase for the
South Yorkshire Regional Adoption Agency over the next 6 months
with an anticipated ‘go live’ date of 01/01/2021;
and
d) Delegate authority to the Director of Children’s Services
and the Director of Social Work (DCST) in consultation with the
Cabinet Member for Children, Young People and Schools, to take
strategic decisions in relation to the implementation of the
SYRAA.
Lead officer: Riana Nelson
The Council’s Revenue budget was
approved at the Full Council meeting on 1st March 2021. The
Council’s MTFS included £2,975,000 for additional
Social Care Support grant, which was announced in the Spending
Review. This funding will be allocated in 2021/22 only, to provide
for additional Children Social Care pressures that are not
provided in the MTFS. The service demand pressures include over 60%
more referrals in July and September compared to the previous year
leading to higher numbers of Children In Need, on average 18%
higher for the period September to November, greater numbers of
Children with a Child Protection Plan, circa. 28% increase for the
same period, and Children in Care. Although the estimated impact on
the majority of the budget areas in 2021/22 is detailed in Appendix
B of the Council’s Revenue Budget report, there are further
areas which will be met from the £2,975,000 funding
allocation, which is delegated to the Director of Learning,
Opportunities and Skills and Assistant Director of Finance (Section
151) in consultation with the Portfolio Holder for Children, Young
People and Skills.
The funding of £2,975,000 will be allocated as follows:
- £1,200,000 to Doncaster Children’s Services Trust
(DCST) to offset the ending of funding from the Department of
Education (DfE) following the revocation of the Statutory Direction
for Doncaster on 31st January 2021. This will be paid to DCST as
part of the normal contract payment commencing in April 2021.
- £54,000 to Doncaster Children’s Services Trust (DCST)
for additional budget required to implement new Social Worker pay
grades to help appoint new staff and retain existing staff as
current pay grades were below neighbouring authorities, therefore
the new grades make Doncaster more competitive. The additional
budget required for the new Social Worker pay grades totals
£198,000 but DCST will fund £144,000 of this from
savings to be delivered from reducing the number of agency workers
that will be required as more Social Workers are appointed and
retained due to the new pay grades. This will be paid to DCST as
part of the normal contract payment commencing in April 2021.
Monitoring the delivery of the workforce strategy will include
targets for reducing agency workers in accordance with the
assumptions included in the budget. This will be monitored via the
contract management meetings with DCST.
- £286,000 to Doncaster Children’s Services Trust
(DCST) to invest in a Social Worker Academy. DCST are implementing
plans to grow their own experienced Social Workers; two initial
cohorts (6 from April 2021 for step up students and either May or
June 2021 for an additional 6), and a further cohort of 12 in
August 2021. The academy should deliver future year savings as the
number of agency Social Workers required will reduce as the newly
qualified workers caseloads increase as their experience grows.
Please see appendix A Social Work Academy business case for further
detail. The Director of Learning,
Opportunities and Skills will approve the release and payment of
funds to DCST as required based on the information provided
regarding the number of appointments made. This will be monitored
via the contract management meetings with DCST.
- Up to £795,000 to Doncaster Children’s Services Trust
(DCST) for additional Social Workers during 2021/22. The caseloads
are monitored closely for average/maximum values and the majority
of workers were carrying high caseloads due to the increased
demand. Based on the estimated caseloads for 2021/22 and the
recommended level per worker, it is estimated that an additional 18
Social Workers will be required to maintain caseloads at a maximum
level per worker. The strategic aim is to achieve an average
caseload not exceeding a range of 18 - 20 children or young people
across Children’s Social Care to enable Social Workers and
other practitioners to provide a high standard of practice to the
children and families they work with. Please see Appendix B DSCT
Case Loads Policy for further detail. This funding
will be released and paid to DCST, following agreement on the
planned
recruitment to reduce the caseloads based on the latest caseload
information available, taking into account the availability of
social workers. The Director of Learning, Opportunities and Skills
will approve the release and payment of funds as required based on
the information provided. This will be monitored via the contract
management meetings with DCST.
- £640,000 to be used as in year Social Care costs
contingency for service reviews and any in year demand pressures on
the Care Ladder. The service reviews and Care Ladder will be
monitored through the contract management meetings with DCST, and
the use of the Social Care costs contingency will be approved and
monitored in the Council’s quarterly Finance
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 14/06/2021
Effective from: 15/04/2021
Decision:
To approve the 2021/22 planned spend of
£2,975,000 Social Care Support Grant delegated to the
Director of Learning, Opportunities and Skills and Assistant
Director of Finance (Section 151) in consultation with the
Portfolio Holder for Children, Young People and Skills.
Lead officer: Riana Nelson
The music service had an audit of instruments
in 2010 with findings that there were £15488 of instruments
unaccounted for, no arrangements were made to write off the
instruments at that time, a subsequent audit was made in March 2019
and the amount of stock that was unaccounted for was £63999
(included the previous amount of £15488). With depreciation
the figure was finalised as £38399 and agreement was given to
write this figure off together with a final improvement plan
to be completed with audit (all recommendations have been
completed).
The service relied on a technical business support officer to
support with the audit requirements of instruments, however
overtime it has become apparent that the instruments require a
technician to ensure that they are accounted for, they are
maintained to full working order and to ensure delivery is
completed as and when needed to schools/pupils. Together with other
duties to support the development of the service of preparing,
recording and editing video and audio of events and online content
to support teaching and learning.
The technical business support officer (30 hours) left their post
in April 2021 and has not been recruited too as yet due to the
request of this post. Consideration was given to continue to rely
on a technical business officer to support the audit requirements,
however, it was felt that this required a specialist technician as
workload of business support did not allow sufficient time to
support the audit and maintenance of instruments to be completed to
an adequate standard and following covid the requirement to produce
digitally recorded resources.
If this post is approved the requirement for a technical business
support officer will be reduced to a transactional business support
role and hours will be reduced to 18.5 hours and savings will be
approx. £9K
Pre covid the Music Service had a surplus income of approx.
£20K, this would support the finances of the new role
together with savings from the business support role.
Pre covid the Music Service management and business support staff
were based in the Point with charges of approx. £7.5K for
office space. Once restrictions are lifted further the Music
Service will move the office to Bentley My Place with agreement
from Dawn Hall – Local Office of the Children’s
Commissioner Manager which will save the service £5 this
year, £7.5K in future years.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 14/06/2021
Effective from: 27/05/2021
Decision:
To create a Music Technician post (Grade 7) to
assist with audit requirements of instruments and to ensure that
instruments are fit for purpose and that the Music Service meet the
requirements of the Arts Council’s funding agreement. To also
support the service in developing content to support teaching and
learning.
Lead officer: Margaret Watson
See attached Officer Decision Record for full
details
Decision Maker: Assistant Director Adults Health and Wellbeing
Decision published: 11/06/2021
Effective from: 22/04/2021
Decision:
To utilise the team’s assessment budget
in an alternative way; to procure fewer Best Interest Assessor
(‘BIA’) assessments via Reed agency (pursuant to the
current DoLS team order against the overarching framework) and
instead use the available budget to employ more BIA staff in the
team on fixed term contracts.
An ODR2 has been completed as the value of the change equates to
approximately £74,000 of the budget that will be used to
employ members of staff within the team, and will not be used to
pay for BIA assessments procured via Reed.
Lead officer: Charlotte Wilson
By appointing a suitable partner via a
procurement exercise, we will be able to take suitable learning
through the course of the project. A partner will provide an
objective view of the project's pathway and opportunity for
reflection and amendment to ensure key targets are met. The insight
and metrics of evaluation are defined; however, this is not
exclusive and if through the learning process other identifiers are
highlighted which support a sustainable evolution of our approaches
they can be incorporated.
Within Get Doncaster Moving (GDM) and the Local Delivery Pilot, the
process learning is invaluable in ensuring the step changes taken
are understood and lessons learnt along the way. Doncaster Future
parks is looking at parks provision in its entirety and wishes to
emulate GDM’s successes. By appointing a partner organisation
to carry out monitoring and evaluation specifically for the Future
parks the evaluation and learning will complement wider evaluation
across Get Doncaster Moving, mirroring a techniques allowing
comparison of outputs.
Decision Maker: Director of Public Health
Decision published: 11/06/2021
Effective from: 09/06/2021
Decision:
To carry out a tendering exercise to appoint a
partner organisation to provide monitoring and evaluation of the
entire Doncaster Future Parks (DFP) project. Until March 31st
2025.
Sport England funding is secured for this element of the project to
take place as part of the DFP programme. The value of the
procurement exercise is for £170,000.00; This is for the
Support of the monitor and evaluator (50k), the development of a
forward plan (10k) and opportunity to share our learning (10k)
provide reports on parks usage data (£100k).
The contract will be engaged using the Local Funding Agreement
delivery partner Terms and Conditions provided by Sport England
currently used on existing partner contracts.
Lead officer: Ben Russell
To comply with the Secretary of States Academy
Order of 11 March 2021.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 22/03/2021
Decision:
Further to the academy order of the Regional
Schools Commissioner issued on 11 March, 2021 the Council is
required to execute all formal documentation to complete the
conversion to Academy Status.
The decision record approves the appropriate instruction to the
Councils Legal Department to complete and seal the documentation in
order to convert New Pastures to academy status from 1 September
2021 and will join the Venn Academy Trust.
Lead officer: Neil McAllister
The Travel assistance service is undergoing a
review and the number of children requiring assistance is
increasing year on year and the current team cannot cope on a day
to day basis as it is not at full capacity.
There is very little scope for additional projects which require
completion in the next 12 months.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 05/03/2021
Decision:
To create an additional Grade 8 Team Manager
post within the Travel Assistance Service for a period of 12
months. This is to provide capacity within the existing team to
undertake a number of projects and service improvements over the
next 12 months. The post holder will assist existing team managers
with daily management of office staff, drivers and escorts
including all HR duties such as Managing Attendance, disciplinary
etc.
Lead officer: Kim Holdridge
See attached Officer Decision Record for full
details
Decision Maker: Assistant Director Partnerships, Early Intervention and Localities
Decision published: 11/06/2021
Effective from: 09/06/2021
Decision:
To agree to extend the temporary positions for
HMP & YOI Hatfield Lakes and HMP Moorland, facilities which
Doncaster Council’s library service is contracted to manage
and deliver on behalf of the prison service.
Lead officer: Matt Cridge
The ongoing impact of the COVID-19 pandemic
has necessitated the establishment of a Children’s Resilience
and Recovery Programme, which in turn has impacted on
resources, in particular, front line staff to work directly with
children, young people and their families.
The current pandemic has simultaneously increased the strain on
families and reduced school capacity to manage early help cases, in
particular step-downs from social care.
This places a risk in the system for vulnerable children and young
people, especially any not in an educational setting. These often
end up in a re-referral into Social Care,
placing greater pressure on an already stretched front door.
Therefore, providing extra Early Help Officers in the form of
Family Lead Practitioners means that educational settings will be
better supported. In effect, the officers can catch the step-downs
and ensure support is provided in a timely and appropriate
manner.
Due to the above, this ODR seeks to establish the following
posts:
? 7 FTE Family Lead Practitioners (Grade 7) temporary for 12
months
? 1 FTE Technical Business Support (Grade 6) temporary for 12
months
The Family Lead Practitioners will be managed within the Early
Intervention and Localities Service.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 11/03/2021
Decision:
Recruit seven temporary Family Lead
Practitioners to support schools to manage children and young
people who are stepped down from social care, in particular into
educational settings, many of whom have Social, Emotional and
Mental Health needs, with direct early help support.
Recruit one temporary Business Support Officer (Technical) to
support the on-going development of the service.
Allocate funding of £216k from the Children’s
Partnership Recovery and Resilience Programme approved by Cabinet
on 26th January 2021.
Lead officer: Alison Tomes
The Council and Team Doncaster Partnership
have embarked upon an ambitious programme to ensure that all
individuals, communities and places feel the impact of the
Doncaster Growing Together Strategy – the Partnerships
guiding plan of action.
This commitment includes an agreement to develop a specific local
focus of partnership working, including a major joint effort on
prevention – spotting and stemming the flow of issues and
concerns before they become acute. This joint local focus will be
ever more important in the post Covid-19 period, and a localised,
community driven approach has been agreed as a key mean to deliver
the Mayor’s published Recovery and Renewal Plan.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 27/08/2020
Decision:
To formally establish a temporary Localities
Team to design, develop and implement the locality working model
and request funding of £604,490 from the Council’s
Service
Transformation Fund. Details of the roles is outlined below and a
proposed structure chart attached
Lead officer: Karen Johnson
Section 25 of the Children and Young Persons
Act requires local authorities to provide Short Breaks for families
with disabled children. This is set out in the Breaks for Carers of
Disabled Children Regulations 2011 (or Short Breaks Regulations
2011), which require local authorities to
do three things:
? To ensure that, when making short break provision, they have
regard to the needs of
different types of carers, not just those who would be unable to
continue to provide care
without a break;
? To provide a range of short breaks, as appropriate, during the
day, night, at weekends
and during the school holidays; and
? To provide parents with a short breaks services statement
detailing the range of available breaks and any eligibility
criteria attached to them.
Following part of the Short Breaks Service Review, and through
recent market engagement research. It was found that there is a
limited amount of providers offering Short Break activities
regularly, leaving less choice for SEND young people. The need for
the Capital Grant to support new providers to register as a
provider on the DPS will add extra value and sustainability to
deliver additional activities for this cohort.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 17/06/2020
Decision:
Following the original approved decision to
proceed with the 50K Short Breaks Capital Grantfund, which
supported the Local Offer and statutory duty to provide Short
Breaks, and to
improve range, capacity and availability of activities across the
borough. Funds were awarded as agreed by panel for successful bids.
Totalling £36718.60, with an underspend of £13,281.40.
(Original ODR 1718171).
Lead officer: Dean Mangham
This is to support the Local Offer and
statutory duty to provide Short Breaks, and to improve range,
capacity and availability of activities across the borough.
(Original
ODR 1718171).
Following evaluation of bids by a multi-agency panel, 8 providers
have been successful in securing Short Breaks Capital Grant
Funding.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 12/03/2020
Decision:
Following the approved decision to proceed
with the Short Breaks Capital Grant fund, award the funds as agreed
by panel on the 23/10/19 for successful bids is to be
actioned.
Lead officer: Dean Mangham
To comply with the Secretary of State’s
Academy Order of 17 October 2019
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 12/11/2019
Decision:
Further to the academy order of the Regional
Schools Commissioner issued on 17 October 2019 the Council is now
required to execute all formal documentation necessary to complete
the conversion to academy status.
This decision record approves the appropriate instruction to the
Council’s Legal section to complete and seal the appropriate
documentation in order for Hawthorn Primary to convert to academy
status on 1 March 2020 as a converter academy. It is proposed that
Hawthorn Primary will join a Multi Academy Trust – Empowering
Minds Academy Trust.
Lead officer: Neil McAllister
See attached Officer Decision Record for full
details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 11/06/2021
Effective from: 28/05/2021
Decision:
Option 2 which provides increased capacity of
DANs whilst providing the extended reach of the Service to standard
and
medium risk DVA referrals whilst linking with communities and
localities and tackling both the stigma and acceptance of DVA in
local communities.
Lead officer: Kaye Rushbrook
See attached Officer Decision Record for full
details
Decision Maker: Director of Public Health
Decision published: 10/06/2021
Effective from: 16/03/2021
Decision:
To fund via grant money, under Local Authority
Test and Trace support Grant Conditions, the continuation of the
IPC specialist nursing service in the community (care homes) from
1.4.2021 to 31 March 2022. The service is currently provided by
contribution of IPC nursing capacity from Doncaster Bassetlaw
Teaching Hospital (DBTH), which consists of 2 nurses from DBTH (1
wte Band 8A; and 0.4 wte Band 6) at a total cost of
£98,115.
Lead officer: Victor Joseph
See attached Officer Decision Record for full
details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 25/03/2021
Decision:
To Grant Supplier Relief as detailed in the
attached Officer Decision Record.
This decision is based on documentary evidence provided by the
providers and assessed by Financial Management and the Schools
Transport Team
Lead officer: Kim Holdridge
See attached ODR for full details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 05/03/2021
Decision:
To grant supplier relied as outlined in the
attached Officer Decision Record
This decision was based on documentary evidence supplied by the
providers and assessed by Financial Management and the Schools
Transport Team.
Lead officer: Kim Holdridge
See attached ODR for full details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 25/02/2021
Decision:
To extend the current contract until 1 October
2021
Lead officer: Derek Brogan
There is a statutory requirement to publish a
Post 16 Transport Policy Statement by 31st May each year in
accordance with the Home to School Statutory Travel and Transport
Guidance published by the Government in 2014.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 22/04/2021
Decision:
There is a statutory requirement to publish a
Post 16 Transport Policy Statement by 31st May each year. Following
legal advice a consultation on the proposed policy for the
2021/2022 Academic year was approved and undertaken in January
2021.
There were no changes proposed within the consultation for 2021/22
and only one response was received from South Yorkshire Passenger
Transport Executive (SYPTE) this contained suggested wording in
relation to the bus passes and tickets which they currently offer.
These updates have been made to the draft policy and a copy is
attached for information.
Approval is now required to publish the policy in May 2021 in
accordance with the guidance.
Lead officer: Kim Holdridge
See attached Officer Decision Record for full
details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 20/11/2020
Decision:
To retrospectively agree to de-register the
Big Picture School with the Department for Education and convert
into an Alternative Provision site offering short term
interventions.
To vary the contract held with Big Issues Invest Limited to reflect
the change from a school to an
Alternative Provision Site.
Lead officer: Fiona Feris
See attached Officer Decision Record for full
details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 12/03/2020
Decision:
Following the approved decision to proceed
with the Short Breaks Capital Grant fund, award the funds as agreed
by panel on the 23/10/19 for successful bids is to be
actioned.
Lead officer: Dean Mangham
See attached Officer Decision Record for full
details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 17/01/2020
Decision:
1.To transfer 19 members of staff from the
line management of North Ridge school to the Travel Assistance
Service department of the Council to take effect prior to the
transfer of the School to academy status
2. To enter into an agreement for the provision by the Nexus Multi
Academy Trust of a bus parking facility and the occasional use by
the Trust of the buses parked there to take the children on field
trips and other outings connected to their education.
3. To enter into a grant agreement to assist with the co-ordination
and administration requirements connected to the provision by the
Council of bus transport to and from North Ridge School for the
children and parents.
Lead officer: Kim Holdridge
See attached Officer Decision Record for full
details
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 04/12/2019
Decision:
To approve the award of grant funding to
successful providers for the provision of short breaks activities
as agreed by the short breaks multi agency panel on the 23.10.19
following the approved decision to proceed with the Short Breaks
Capital Grant Fund Scheme on the 22/8/2017 (Original ODR
1718171)
Lead officer: Dean Mangham
Only one of the interested schools meets the
national rate for the achievement of grade 5 or above in English;
and only two of them meet the national rate for the achievement of
grade 4 or above.
The range for grade 5 or above is from 2.7% to -32.3%; the range
for grade 4 or above is from 6.6% to -34.4%. In the four interested
schools, the difference between the progress of disadvantaged
students and the national rate for non-disadvantaged students is in
a range from -0.06 to -1.41.
The interested schools cover a range of contexts and the priority
for project leaders will be their voluntary engagement.
Metacognition and working memory are key components of the new
Ofsted framework which will come into being in 2020/21.
Decision Maker: Director of Learning, Opportunities and Skills
Decision published: 10/06/2021
Effective from: 12/11/2019
Decision:
To grant New College Doncaster £45,000
to deliver a project which will bring together 6 volunteer
secondary schools to test the effectiveness of a Metacognition
intervention with year 9 students.
The focus of the project will be retrieval practice, a key skill
which links to a wider range of qualities including resilience and
self-regulation. New College Doncaster are uniquely placed to
deliver this as they have the materials and
expertise available to carry out the trial, given they use
metacognition strategies within their current environment.
This project will test assumptions locally, building on research
undertaken by the Education Endowment Foundation. If proven to be
an effective method for Doncaster, individual schools may choose to
adopt the approaches.
There are four key objectives:
to trial, test and evaluate strategies for developing memory and
retrieval skills with a group of year 9 students in order to
prepare them for the demands of GCSE assessment;
to establish ways of learning which will not only improve long-term
memory but develop students’ ability to tackle challenging
problems and difficulties within and between
subjects;
to engage English teachers of year 9 students in the development of
their skills in disciplined inquiry, subsequently extending this to
teachers of other subjects and across
a wider range of schools;
to support schools in establishing and sustaining a culture of
student independence and resilience, leading to sustainable change
and improved outcomes.
Lead officer: Claire Hughes
The government has advised public bodies via
the PPN 02/20 and PPN 4/20 Supplier Relief due to COVID19, to help
ensure supplier sustainability through the COVID19 pandemic and
through its recovery phase.
Decision Maker: Director of Corporate Resources
Decision published: 10/06/2021
Effective from: 20/08/2020
Decision:
To grant supplier relief under the SRS for the
three months period from 1st April to the 30th June 2020.
This decision based on documentary evidence provided by the
providers and assessed by the SRS Panel consisting of Procurement,
Financial Management and the Schools Transport Team
Lead officer: Holly Wilson
The government has advised public bodies via
the PPN 02_2020 Supplier Relief due to COVID19, to help ensure
supplier sustainability through the COVID19 pandemic.
Decision Maker: Director of Corporate Resources
Decision published: 10/06/2021
Effective from: 13/07/2020
Decision:
To grant supplier relief under the SRS for the
three months period from 1 April to the 30 June 2020.
This decision based on documentary evidence provided by the
providers and assessed by the SRS Panel consisting of Strategic
Procurement, Financial Management and the Schools Transport
Team.
Lead officer: Holly Wilson
The government has advised public bodies via
the PPN 02_2020 Supplier Relief due to COVID19, to help ensure
supplier sustainability through the COVID19 pandemic.
Decision Maker: Director of Corporate Resources
Decision published: 10/06/2021
Effective from: 01/07/2020
Decision:
To grant supplier relief under the SRS for the
three months period from 1 April to the 30 June 2020.
This decision based on documentary evidence provided by the
providers and assessed by the SRS Panel consisting of Strategic
Procurement, Financial Management and the Schools Transport
Team.
Lead officer: Holly Wilson
The government has advised public bodies via
the PPN 20_2020 Supplier Relief due to COVID19, to help ensure
supplier sustainability through the COVID19 pandemic.
Decision Maker: Director of Corporate Resources
Decision published: 10/06/2021
Effective from: 10/06/2020
Decision:
To grant supplier relief under the SRS for the
three months period from 1 April to the 30 June 2020.
This decision based on documentary evidence provided by the
providers and assessed by the SRS Panel 18.05.20 consisting of
Strategic Procurement, Financial Management and the Schools
Transport Team.
Lead officer: Holly Wilson
See attached Officer Decision Record for full
details
Decision Maker: Assistant Director Legal and Democratic Services
Decision published: 10/06/2021
Effective from: 22/01/2021
Decision:
To approve the following application for grant
funding from the Doncaster Community Fund – Ward Member
Budget
a. Dunscroft Warriors Junior Football Club
Reference No: 44/DCF/MWB/Hat
Supported by: Councillor Curran
Cost £2,000
b. Community Reaching You
Reference No: 47/DCF/MWB/N&Ask
Supported by: Councillor White, Councillor Beech, Councillor
Gilliver
Cost £3,000 (£1,000 x 3 Councillors)
c. Scouting involvement in improvements to the natural
environment
Reference No: 49/DCF/MWB/EdKS&BD
Supported by: Councillor Robinson, Councillor Keegan,
Councillor
Nevett
Cost £450.00 (£150 x 3 Councillors)
Lead officer: Andrew Sercombe
See attached Officer Decision Record for full
details
Decision Maker: Assistant Director Legal and Democratic Services
Decision published: 10/06/2021
Effective from: 26/01/2021
Decision:
To approve the following application for grant
funding from the Doncaster Community
Fund – Ward Member Budget
a. Activity Bags
Reference No: 50/DCF/MWB/Ros&B
Supported by: Councillor Blake, Councillor Cooke and
Councillor
Cooper
Cost £397.42 (132.47 x 3 Councillors)
b. Bawtry Action for Recreation and Sport (BARS)
Reference No: 51/DCF/MWB/Ros&B
Supported by: Councillor Blake, Councillor Cooke and
Councillor
Cooper
Cost £600.00 (£200.00 x 3 Councillors)
Lead officer: Andrew Sercombe
To ensure that the Council’s interests
are sufficiently represented through its appointments to these
bodies.
Such appointments help to ensure that the Council’s views are
represented to local and national groups and, where the
representative has voting rights, that the Council is involved in
any decisions that may affect the people of the Borough.
Decision Maker: Assistant Director Legal and Democratic Services
Decision published: 10/06/2021
Effective from: 11/01/2021
Decision:
To approve the following change to the
schedule of Executive appointments to outside bodies for the period
2020/21 with immediate effect:
St Leger Homes of Doncaster Board – to remove Councillor Jane
Nightingale from the Board and appoint Councillor Paul Wray.
Lead officer: Jonathan Goodrum
See attached Officer Decision Record for full
details
Decision Maker: Assistant Director Legal and Democratic Services
Decision published: 10/06/2021
Effective from: 12/03/2021
Decision:
To approve the following application for grant
funding from the Doncaster Community Fund – Ward Member
Budget
a. Wildlings and Wellbeing CIC
Reference No: 76/DCF/MWB/HexBN&BS
Supported by: Councillor John Healy
Cost £1,000
b. Brighter Days Wellbeing CIC
Reference No: 77/DCF/MWB/Con&Den
Supported by: Councillor Lani Mae Ball
Cost £600
c. Conisbrough & Denaby Positive Activities Group
Reference No: 78/DCF/MWB/Con&Den
Supported by: Councillor Ian Pearson
Cost £494.26
d. Entour
Reference No: 79/DCF/MWB/Con&Den
Supported by: Councillor Nigel Ball
Cost £1,000
e. Conisbrough Community Events
Reference No: 80/DCF/MWB/Con&Den
Supported by: Councillor Nigel Ball
Cost £200
f. Kool Kayakers Canoe Club
Reference No: 81/DCF/MWB/Nor&Ask
Supported by: Councillor White, Beech and Gilliver
Cost £1,000 x 3 Councillors
g. SERV (Stainforth Environmental Regeneration Volunteers)
Reference No: 71/DCF/MWB/St
Supported by: Councillor George Derx
Cost £1,000
Lead officer: Andrew Sercombe
The government has advised public bodies via
the PPN 20_2020 Supplier Relief due to COVID19, to help ensure
supplier sustainability through the COVID19 pandemic.
Decision Maker: Director of Corporate Resources
Decision published: 10/06/2021
Effective from: 15/06/2020
Decision:
To grant supplier relief under the SRS
totalling for the three months period from 1 April to the 30 June
2020.
Lead officer: Holly Wilson
Decision Maker: Cabinet
Made at meeting: 09/06/2021 - Cabinet
Decision published: 09/06/2021
Effective from: 09/06/2021
Wards affected: (All Wards);
Lead officer: Julie Crook, Dave Richmond
Decision Maker: Cabinet
Made at meeting: 09/06/2021 - Cabinet
Decision published: 09/06/2021
Effective from: 09/06/2021
Wards affected: (All Wards);
Lead officer: Matthew, Smith
Decision Maker: Cabinet
Made at meeting: 09/06/2021 - Cabinet
Decision published: 09/06/2021
Effective from: 09/06/2021
Lead officer: James Thomas, Rob Moore
Cabinet:-
(1) considered the options for the delivery model for public health services for children and young people aged 5 to 19 years old;
(2) agreed to the commencement of a tender process to find a suitable provider, or providers to deliver public health services for children and young people aged 5 to 19 years old in Doncaster;
(3) supported the extension of current contracts for public health 5 to 19 services by 4 months to align with the academic year; and
(4) approved the delegation of the contract award to the Director of Public Health, in consultation with the Portfolio Holder and subject to compliance with Council Procedure Rules.
Decision Maker: Cabinet
Made at meeting: 09/06/2021 - Cabinet
Decision published: 09/06/2021
Effective from: 09/06/2021
Wards affected: (All Wards);
Lead officer: Carrie Wardle